www.expressindia.com - Weather | Horoscope | Stocks | RSS
expressindia web city
HomeBlogsCricketAstrology TendersClassifieds Reader Comments Hotels
Sign In / Register | Archive
Expressindia » Story

Bandra-Worli sea link hit by delay, again

Font Size

Swapnil Rawal

Posted: Jan 13, 2009 at 0344 hrs IST

Mumbai The much-awaited infrastructure showpiece expected to transform Mumbai’s skyline and ease some of its traffic woes, the Bandra-Worli Sea Link, has once again failed to keep its date with motorists.

The state government, which planned to partially open the sea link by January-end, is now looking at March-end for a possible opening of the iconic structure.

Vimaltai Mundada, Minister of Public Works Department (Public Undertakings), said construction work at one section, lighting on the link and final touches are still remaining.

“Construction work remains to be done on the Worli-end. We’re keeping constant check of the progress of the work. From the assessments of the review meetings we think the sea link should be open to traffic by March-end,” Mundada told Newsline.

Hindustan Construction Company (HCC), the contractor for the link, said construction of around 240 metres is remaining on the Worli-side and will be completed by mid-March. The remaining four lanes are expected to be operationalised by July, the minister added.

According to the original plan of the state government, the sea link was to be completed by 2003, but the project has been embroiled in various issues such as logistical, environmental clearance and public interest litigation leading to its delay and subsequent cost escalation.

The original cost of this 5.6-km sea bridge was Rs 400 crore which shot up to nearly Rs 1,400 crore. Of this, around Rs 515 is the cost of the bridge, the rest is for developing approach roads on both ends of the sea-link, providing a quick dispersal system, at both ends and other expenses.

The Bandra-Worli Sea Link is an eight-lane, twin carriageway having a cable-stayed bridge design that will enable speedy travel between Bandra and Worli. Traffic studies have estimated that due to the sea link, motorists using this bridge will save about 30 minutes of travel time and delays of 23 signals, they face at present.

The link will be able to accommodate about 1.20 lakh motorists per day. At present, Mahim Causeway is the only link connecting the western suburbs with the island city of Mumbai. This north-south traffic corridor is very congested and during the peak hours results in a bottleneck at Mahim Causeway.

Discuss this story on expressindia forums
Post Comments
Name* Email ID*
Subject* Country*
Message*
Characters remaining
 
TERMS OF USE: The views, opinions and comments posted are your, and are not endorsed by this website. You shall be solely responsible for the comment posted here. The website reserves the right to delete, reject, or otherwise remove any views, opinions and comments posted or part thereof. You shall ensure that the comment is not inflammatory, abusive, derogatory, defamatory &/or obscene, or contain pornographic matter and/or does not constitute hate mail, or violate privacy of any person (s) or breach confidentiality or otherwise is illegal, immoral or contrary to public policy. Nor should it contain anything infringing copyright &/or intellectual property rights of any person(s).
I agree to the terms of use.

Latest News

Business

Showbiz

Sports

CWG scam: Delhi HC grants bail to Games chief Suresh Kalmadi

Rushdie goes silent on Twitter, no hints about his India visit

Orissa Dalit gangrape: Charged with sheltering accused, agriculture minister resigns...

'Martin Luther King was shocked after being called untouchable in India'

Can't act against Zardari, Gilani tells Pak SC; case adjourns till Feb

Narendra Modi's 'pranks' sparked 'constitutional mini-crisis': Judge

Stuck in door, man dragged by train to next Metro station

More
© 2011 The Indian Express Limited. All rights reserved
Advertise With Us | Privacy Policy | Feedback | Express Group | Site Map