www.expressindia.com - Weather | Horoscope | Stocks | RSS
expressindia web city
HomeBlogsCricketAstrology TendersClassifieds Reader Comments Hotels
Sign In / Register | Archive
Expressindia » Story

Indian Railways to embark on expansion journey in Gujarat

Font Size

Express News Service

Posted: Feb 16, 2009 at 0004 hrs IST

Ahmedabad With massive infrastructure projects such as Dedicated Freight Corridor (DFC) and the Delhi-Mumbai Industrial Corridor (DMIC) already in the pipeline, the Indian Railways (IR) connectivity is all set for network expansion in Gujarat.

The DFC project, slated to be IR’s biggest venture till date, envisages construction of 1,483-km western corridor passing through the state, linking the Jawaharlal Nehru Port Trust (JNPT) with Tughlakabad/Dadri.

IR has put the estimated cost of the western corridor at Rs 218.56 billion. The Special Purpose Vehicle (SPV) for the project, called the Dedicated Freight Corridor Corporation of India Limited, is likely to begin construction work by the second half of 2009. In

addition, the feeder routes of the western corridor connecting ports in Gujarat will also be upgraded.

According to railway officials, the 920-km-long Rewari-Vadodara section is targeted to be completed by 2016 and the remaining 430-km of the Vadodara-JNPT section will be completed by 2017.

Besides, the Japan International Cooperation Agency (JICA) will provide a loan of Rs 180 billion for undertaking the construction work of the first phase of Rewari-Vadodara section. JICA is carrying out a feasibility study for the section right now.

Moreover, a stretch of about 150 km will be developed as DMIC on both sides of the DFC. It will have a high axle, double-track and high-speed freight movement railway facility with computerised control. It will thus provide high-speed connectivity between Delhi and Mumbai, with the track running almost parallel to the current track covering Delhi-Jaipur-Ahmedabad-Mumbai.

IR has also planned two new projects, which will be undertaken through the Public-Private Partnership-Special Purpose Vehicle (PPP-SPV) route, namely the Surat Hazira Railway Company and Dholera Port Railway Company.

Of these, the Surat Hazira project, with an estimated cost of Rs 1.34 billion, is a 36.36-km long railway track that will provide a broad gauge electrified rail link between the Mumbai-Vadodara trunk route and Hazira port.

Its implementation is envisaged over a three-year period, officials said.

Discuss this story on expressindia forums
Post Comments
Name* Email ID*
Subject* Country*
Message*
Characters remaining
 
TERMS OF USE: The views, opinions and comments posted are your, and are not endorsed by this website. You shall be solely responsible for the comment posted here. The website reserves the right to delete, reject, or otherwise remove any views, opinions and comments posted or part thereof. You shall ensure that the comment is not inflammatory, abusive, derogatory, defamatory &/or obscene, or contain pornographic matter and/or does not constitute hate mail, or violate privacy of any person (s) or breach confidentiality or otherwise is illegal, immoral or contrary to public policy. Nor should it contain anything infringing copyright &/or intellectual property rights of any person(s).
I agree to the terms of use.

Latest News

Business

Showbiz

Sports

Wild joyride turns tragic as car kills 2 in Delhi

EC notice to Ajit Singh son for accepting cash from supporters

Tendulkar, Sehwag not good enough: Dhoni

Moga sex assault case: Noose tightens around Makhan

Magistrate watches as youth forced to do sit-ups

Sex-changing treatment for kids on the rise

Soon, driverless cars will zoom in streets with no stoplights

More
© 2011 The Indian Express Limited. All rights reserved
Advertise With Us | Privacy Policy | Feedback | Express Group | Site Map